Spaulding-lighting ARF2 Architectural 20 LED Floodlight Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Beleuchtung Spaulding-lighting ARF2 Architectural 20 LED Floodlight herunter. Spaulding Lighting ARF2 Architectural 20 LED Floodlight User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 1
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
INSTALLATION INSTRUCTIONS - ARF LED FLOOD SHEET 1 OF 2
SAVE THESE INSTRUCTIONS
701 Millennium Boulevard Greenville, SC 29607 (864) 678-1000
www.spaulding-ltg.com
93050813 Rev. B
READ THOROUGHLY BEFORE INSTALLATION
WARNING!
Fixtures must be grounded and installed in accordance with the National Electrical Code and all local codes. Failure to do so may increase
the
RISK OF PERSONAL INJURY, PROPERTY DAMAGE, FIRE AND DEATH.
Install and use so fixture failures do not cause a hazard and use only in
environments for which the product is specifically marked.
WARNING!
This product contains chemicals known to the State of California to cause cancer, birth defects, and/or other reproductive harm. Thoroughly
wash hands after installing, handling, cleaning, or otherwise touching this product.
WARNING!
Dangerous voltage exist within the unit and all precautions usually observed in handling high voltage equipment should be observed when
replacing light engine or otherwise servicing luminares. Disregarding this warning could result in electrical shock and possible injury to the individual
installing or servicing this equipment. Installation and servicing should be done by qualified personnel.
CAUTION!
Follow ALL luminaire recommendations, product markings, instructions, restrictions and warnings regarding luminaire operation and burning
position. Luminaire label shows electrical and environmental requirements and restrictions.
NOTE!
This luminare is designed for outdoor lighting applications with ambient temperatures not exceeding 40°C (104°F).
All electrical work must be done by a qualified electrician.
Turn off electric power to all affected circuits and allow to cool before installation or servicing.
A regularly scheduled maintenance program should be established to retain optimum light output and reduce heat retention. Dusting with a soft, clean,
dry cloth is normally sufficient for the optical system. Any accumulation of dust or dirt should be removed regularly.
Carefully read these instructions before installing product. If you do not understand these instructions, before starting any work, contact your Hubbell
Lighting distributor or techsu[email protected] or (864) 678-1000
Give instructions to facility owner/manager for future reference.
Mounting The Fixture (See Fig. 1)
Turn off power to electrical connections.
Wiring must be performed by a qualified electrician.
Make electrical connections according to the local and National Electrical
Codes.
Remove fixture from packaging along with hardware bag.
There are three wires coming out of this fixture:
Black Wire - Line Voltage
White Wire - Neutral
Green Wire - Ground
Connect these wires to the supply wires using the wire nuts provided in the
hardware bag.
Thread fixture onto electrical box using the
1
/
2
-14 threads on knuckle (Item
1 in Fig. 1).
Once fixture is pointing in the desired direction, tighten the lock nut (Item 2
in Fig. 1) to the electrical box to prevent any further rotation.
Loosen the bolt (Item 3 in Fig. 1) on the knuckle using a 7/16" wrench to
allow the fixture to be aimed up or down.
Once the fixture is aimed at the desired target, tighten the bolt (Item 3 in
Fig. 1) on the knuckle.
1
2
3
Fig. 1
Seitenansicht 0
1

Inhaltsverzeichnis

Seite 1 - SAVE THESE INSTRUCTIONS

INSTALLATION INSTRUCTIONS - ARF LED FLOOD SHEET 1 OF 2SAVE THESE INSTRUCTIONS701 Millennium Boulevar

Kommentare zu diesen Handbüchern

Keine Kommentare